Adam Rollins Schertz approves design for $32M road reconstruction project The project includes significant improvements to a 2.52-mile stretch of Lower Seguin Road.
Adam Rollins ADOT moves into final design phase for $61M interchange project In the final design phase, ADOT opted for a tight diamond configuration for the upcoming interchange over Riggs Road.