UW-Platteville announces $124M overhaul of engineering building

March 20, 2025

The University of Wisconsin-Platteville (UW-Platteville) will spend $123.7 million to renovate and expand its engineering building. The project will convert the 60-year-old Ottensman Hall into a flexible learning and collaborative facility. Construction is expected to begin in May 2028.

The project will start by developing a replacement data center and upgrading campus computer equipment. Additional work will build out a forensic investigation laboratory and a biosafety level 2 instructional and research morgue. The high-bay civil engineering laboratories will be renovated, and all chemistry instructional and research laboratories will have their size, shape and configuration corrected.

UW-Platteville will provide adjacencies to the chemical stockroom, instrumentation laboratories and support spaces for the chemistry sections. To meet student and faculty needs, the university will update and resolve all teaching and technology inadequacies in the laboratories. This will include full replacement of the fume hood and exhaust system and building general access classrooms.

Plans include replacing all building infrastructure systems, including mechanical, electrical, telecommunications, fire protection and plumbing. The university will retrofit a fire suppression system and repair the building domestic water service. The project will repair and replace the building’s exterior envelope concrete and masonry, roof sections and install new exterior windows.

Additional work will reconfigure the exterior entrances and exits and repair or replace the retaining wall at the north entrance plaza. The university will improve the interior circulation and wayfinding solutions. Architectural finishes will be replaced and restored and issues with the stormwater and drainage systems will be addressed.

As part of the project, the university plans to demolish Gardner Hall and Royce Hall, with the potential demolition of Pioneer Tower and restoring associated sites. UW-Platteville will ensure construction adheres to Leadership in Energy and Environmental Design (LEED) certification standards.


Photo courtesy of James Steakley

Adam Rollins

Adam Rollins brings his expertise as a Researcher and Writer to the Managing Editor role for several of SPI's key publications, including Government Contracting Pipeline, Texas Government Insider, and the latest addition, Government Market News. With a rich background as a freelance Content Specialist, Adam has honed a passion for learning and information gathering, delving into various industries. His research and writing have spanned a range of topics, from artificial intelligence (AI) technology, conservation, and project outsourcing, to managed IT services and software development.

Holding a bachelor's degree in English from Texas State University, Adam's proficiency in message development is complemented by his robust research skills and seasoned writing experience. These attributes make him an invaluable asset to SPI, ensuring the delivery of insightful and impactful content to the company's clientele.

Don't Miss

Massive support, funding now available to improve supply-chain networks

New opportunities for multimodal freight, rail, and port projects are
A hospital hallway.

New hospitals greenlit for Amarillo, Wichita Falls

The Texas Health and Human Services Commission (HHSC) is searching